December 2016


YOU'LL  IT

Main House

The main house lower level walls are now all poured and the forms have been removed. The black tar water barrier in on and we are ready for the excavator to come and back fill.

Work begins on framing up for the main house floor slab.

POSTED ON December 1, 2016


A Good Friend

My long-time friend, Enjil is visiting, so of course we went up to the lot for an inspection. So good to see her... we have got a lot of great history and memories together here on St. John.

POSTED ON December 7, 2016


More Excavation

The trackhoe arrived to back-fill the main house. We now have a back yard! There is even room to drive up to the back. This is going to be helpful in pouring the main slab (scheduled for December 20th). We're debating as to wether we should add another little drive up and around the back of the main house... sure would be convenient and give some addtional parking. While the trackhoe was here Jose did a bit of grading on the cottage driveway.

POSTED ON December 9, 2016


Main House Electrical & Plumbing

Pipes and conduit are going into place in anticipation of our big concrete pour next week.

POSTED ON December 11, 2016


Cottage Pool

The cottage pool is framed up and ready for concrete next week.

POSTED ON December 15, 2016


Merry Christmas!

POSTED ON December 20, 2016


Time for an Inspection!

In keeping with our previous building “Champagne Inspection" tradition and in the spirt of the holidays, it seemed like a good time to have an inspection. It was great to see everyone, thank you all for coming! Just one snafu, I was so busy pouring (and drinking) champagne I did not take any photos :( Luckily, Diane sent me a few that she took... thank you Diane! I'm sorry to be missing photos of lots of people... Steve, Geri, Julia, Mark, Mike, Bob and Karye to name a few. I will be sure to have my camera ready next time.

POSTED ON December 29, 2016



Here's the Spot