October & November 2016


YOU'LL  IT

Rencontre avec L'ingénieur

An off island rendezvous at Cafe' Montorgueil in the 2nd Arrondissement, with our engineer extraordinaire, Paul and his wife Diane, to discuss recent developments of our project . Champagne provided the inspiration, with plans of action sketched out on a cocktail napkin, made it all worth the travel :)

POSTED ON October 5, 2016


Cottage Cistern

The cottage cistern slab is poured and framing is up for the cistern walls and pump room.

POSTED ON October 7, 2016


Concrete Trucks on Parade

Ten concrete trucks showed up today! Initially, the concrete company told us they couldn’t schedule us for another pour until the end of October. We would have been at a stand-still for 2 weeks. We don't know what changed but we don't care. Our cottage cistern walls and the main house slab is done!

POSTED ON October 15, 2016


Moving Along

The cottage cistern forms are striped and the guys are busy framing for the cottage main floor slab. From left to right is Tommy, Bollo and Harley. Ramon is standing up top where the cottage main floor will be. The cottage is on the high end of lot and the views are stunning.

POSTED ON October 19, 2016


Ready for Concrete

The main house cistern forms are up and plumbing is ready for cottage floor. Concrete coming in a couple of days.

POSTED ON October 27, 2016


We're Officially "OK'ed"

A surprise inspection from our friend, and now neighbor, Jeff Clabaugh of Villa Bongo Bongo fame. Jeff, and his partner Russ, were building Bongo Bongo back around the same time we were building Arc du Soleil, and they graced our building blog back then. So here is Jeff for an encore visit to the new site. Jeff was on his way to pick up Russ from the ferry and said he would stop by again with Russ. Harley told him we were are pouring on Saturday (concrete, not Rum) and to be sure to bring along your concrete boots!

POSTED ON November 2, 2016


Cottage Main Floor & Main House Cisterns

The main house's cistern walls were poured today. While we were waiting for concrete the guys started framing the rest of the main house lower level. Below with the cisterns is the garage (Harley's man-cave), the mechanical room and to the right, a storage room. The cottage main level floor slab was also poured. Mike gave the cottage floor a nice buff with a power trowel to give it a marble effect. Once the gray concrete gets a shiney sealer it will make for a beautiful floor.

POSTED ON November 5, 2016


Move in Ready?

Not quite move in ready:) but the back area around the cottage is now back filled. And the framing for the main house lower level continues.

POSTED ON November 12, 2016


Main House Lower Level Walls

Aonther big concrete pour today. All of the walls of the level of the main house are now in place. The cottage pool slab (bottom left) and the cottage outdoor shower slab (bottom right) were also poured. Cha-ching! Cha-ching!

POSTED ON November 30, 2016



Here's the Spot